The Laduno Project: a strategic shift towards residential development

 

The highly anticipated 'Laduno' project in Erpeldange, initially outlined to feature a substantial mix of offices, shops, and a hotel alongside approximately fifty housing units, has been significantly modified. Under the new PAP Laduno project, the development's primary emphasis has shifted to residential offerings, now prioritizing an impressive 205 housing units. Consequently, the allocation for offices and commercial shops has been substantially reduced, signaling a new direction for this key development in Luxembourg.

 

Evolving commercial opportunities for businesses in Erpeldange

 

For businesses eyeing commercial space in Erpeldange, this strategic redirection means a recalibrated landscape. While the large-scale commercial footprint initially planned has been scaled back, the project still integrates a component of offices and shops, albeit in much fewer numbers. This shift may present unique opportunities for local service providers, such as physiotherapists or hairdressers, which are specifically desired within the commune. Businesses looking for targeted retail or community-focused service spaces within a newly developed residential hub should explore these evolving prospects.

 

Project scale, design, and infrastructure updates

 

The overall volume of the Laduno project has been adjusted downwards, from 55,000 to 43,500 square meters, reflecting the change in focus. The design now encompasses 10 buildings, an increase from the original 8, which will maintain heights between 5 and 11 floors. These structures are designed to be less massive and more spread out, contributing to a more integrated urban fabric. Essential infrastructure, including two underground parking levels, remains part of the plan, with calculations for capacity adjusted to align with the reduced office and commercial spaces.

 

Navigating the project timeline for future planning

 

Businesses considering Erpeldange as a future location should note that the exact start date for construction of the Laduno project is not yet determined. The commencement is contingent on a critical agreement between the commune, Luxlait, and the State regarding the cost-sharing arrangements for access to the adjacent Nordstadlycée. Prospective tenants and investors are advised to monitor official announcements for updates on this crucial aspect, which will dictate the project's progression and the availability of commercial spaces.

 

Source: infos.rtl.lu